UndervaluedEquity.com
Page: Mine Life Cycle - How Accurate are the Resources Reported in Each Project Phase

My Due Diligence
   Understanding the Stock Market
   Dow to Gold Ratio
   S&P 500 PE Ratio
   January Effect
   My Stock Market Analysis
   How to Invest in Shares
   Analysts's Stock Ratings
   Country Risk Assessment
   Management Assessment
   Key Management Positions
   Management Compensation
   Management Evaluation
   Insider Stock Trading
   Insider Stock Ownership
   Company Ownership Search
   Insider Trading Rules
   Insider Trading Canada
   Insider Trading USA
   Personal Stock Holdings
   Monitor Your Portfolio
   Share Structure
   Employee Stock Options
   Flow-Through Shares
   Short Stock Positions
   Stock Warrants
   Oil and Gas Companies Analysis
   Oil and Gas Exploration Companies
   Investing in Oil and Gas Companies
   Oil and Gas Flow Rates
   Fracking Definition
   Resources and Reserves Definitions
   Mining Companies Analysis
   Mining Industry Standards
   CIM Definition Standards
   Mineral Resource Stocks
   Gold Mining Shares
   Mineral Exploration Companies
   Drilling Rigs
   Drilling Program
   Drilling Results
   Metal Equivalent Calculation
   Metal Recovery Rate
   Mining Costs
   Break Even Analysis
   Metal Value per Tonne
   Mineral Deposit Value
   Mine Life Cycle
   How Do I Invest in Stocks
   How Do I Buy Stocks
   Insider Ownership Analysis
   Country Risk Ranking System
   Stock Investment Analysis
   Institutional Ownership Assessment
   Management Compensation Analysis
   Management Compensation Comparison
   Management Compensation Evaluation
   Shorting a Stock
   Stock Options and Warrants
Support Me
Free Charts
   Base Metals Price Charts
   Energy Price Charts
   Fertilizer Price Charts
   Precious Metals Price Charts
   Stock Market Indices
ETF Finder
   Base Metals ETFs
   Copper ETFs
   Lead ETFs
   Nickel ETFs
   Tin ETFs
   Energy ETFs
   Coal ETFs
   Crude Oil ETFs
   Natural Gas ETFs
   Uranium ETFs
   Fertilizer ETFs
   Potash ETFs
   Minor Metals ETFs
   Rare Earth Metals ETFs
   Precious Metals ETFs
   Gold ETFs
   Palladium ETFs
   Platinum ETFs
   Silver ETFs

Mine Life Cycle - How Accurate are the Resources Reported in Each Project Phase

A typical mining project goes through different phases which are collectively referred to as the mine life cycle. In the following table1 you see a detailed description of the mine life cycle.

images/Mine-Life-Cycle_MinePhaseObjectivesandActivities.gif

First, an exploration program is initiated to gather information about the potential presence of a mineable orebody. Exploration information is defined according to the CIM standards2 as follows:

Exploration information means geological, geophysical, geochemical, sampling, drilling, trenching, analytical testing, assaying, mineralogical, metallurgical and other similar information concerning a particular property that is derived from activities undertaken to locate, investigate, define or delineate a mineral prospect or mineral deposit.

In the exploration phase, the results of a drill program are reported under supervision of a qualified person2 who will publish the first (and future) mineral resource estimate(s).

If the preliminary economic assessment indicates that the project could be economically viable, management will hire a consulting firm who will start with the preliminary feasibility study2. Well-known consulting firms are: SRK Consulting, Tetra Tech, and Behre Dolbear.

When management concludes - based on the outcome of the preliminary feasibility study - that the resource has the potential to be extracted from the ore in a profitable manner, a consulting firm will be hired to complete the (bankable) feasibility study2. This final feasibility study will include the engineering design.

After receiving the bankable feasibility study, management has to arrange the best possible project financing: this is one of the hardest tasks for management to complete. Therefore, I always prefer to see a financial specialist in the management team, who already has raised significant amounts of money in the past (although this is not a guarantee that the financing will be completed without any problems).

Finally, when management has secured the project financing, the company can start with the construction phase. There is a lot of uncertainty during the construction phase, which can have a negative impact on share prices. Declining share prices in the construction phase are often caused by costs over running from the original estimates from the bankable feasibility study. As estimating is not an exact science, keep the accuracy levels from the table below in mind! When (you suspect) additional financing is necessary, always be very careful when holding these stocks, as their share prices often decline very fast. Alternatively however, these situations of very fast declining share prices could lead to ideal buying opportunities too.

If you are interested to find out how I use the accuracy levels from the table below for my own investment analysis, I refer you to the note at the bottom of this page.

As soon as the construction phase is over, the mine will be taken into production. This phase has to lead to one goal: profit from operations! Brownfield exploration can lead to an extended mine life.

Finally, the mine will be closed and the land must be returned to its pre-disturbance condition.

The Accuracy Level of the Resources Reported in Each Project Phase of the Mine Life Cycle

Project Phase 

Accuracy of Reported Resources 

Exploration 

-

Preliminary Economic Assessment (PEA)
(also referred to as Economic Analysis

30-40%

Preliminary Feasibility Study (PFS)
(also referred to as Pre-Feasibility Study

20-30%

Bankable Feasibility Study (BFS)
(also referred to as Final Feasibility Study or Feasibility Study

10-20%

Construction Phase 

5-10%

Operations 

-

Closure 

-

 

If you would like to be the first to be informed when I add new content to UndervaluedEquity.com, please leave your details in the name grab form on the Support page!

You can also support me directly by clicking on the advertisements that appeal to you, or by making a voluntarily donation with Paypal.

Your support helps me to speed up the process of adding great, free content to UndervaluedEquity.com!

 

Note: In order to valuate a typical mining project which is not in production, I subtract a percentage of the reported mineral resources depending on the project phase the company finds itself in. For the PEA, PFS and BFS I deduct 35%, 25% and 15% respectively.

 

What Type of Content Can You Expect to Find on UndervaluedEquity.com

Main Section  Description 
News (RSS)  Today's News Related to the Global Energy and Mining Stocks. On this page a RSS feed is displayed with stock market news related to the energy and mining sectors. You can subscribe to this free RSS feed too! 
My Due Diligence  How I Conduct My Stock's Due Diligence Investigation Process. If you want to know what I learned while I was conducting my due diligence, I recommend you to read all the chapters of the investigation process. 
My Stock Watchlist  Are These the Best Stocks to Buy Today. In my stock watchlist you find stocks who offer great potential, but at the time I analysed these stocks they didn't comply with all my guidelines from my due diligence chapters. 
My Stock Portfolio 

Are These the Best Shares to Buy Now. As the year 2015 has just started, I believe it's about time that I share my stock portfolio with you. Therefore, you will find my updated stock portfolio on this page.

 

 

comments powered by Disqus

 

1 Image Source: http://www.gardguide.com/index.php/Chapter_4

2 CIM Definition Standards


Support Me
Contact
Books
Free Charts
ETF Finder
Legal Terms
Sources